    Epoxy Primer is a fundamental, high-performance two-component coating system engineered to provide exceptional corrosion resistance and adhesion as the critical foundation for industrial and commercial protective coating projects. Comprising an epoxy resin and a polyamine hardener, this primer cures through a chemical reaction to form an extremely tough, dense, and chemically resistant barrier that tenaciously bonds to prepared substrates. Its primary role is to create a stable, inert layer on surfaces such as steel, concrete, and aluminum, effectively isolating the base material from moisture...
  • Share:
  • Contact us Inquiry

Epoxy Primer

 

 

1. Product Composition:

The two-component anti-corrosion primer consists of epoxy resin, anti-corrosion pigment, filler, additive, solvent and polyamide curing agent.

II. Product Features:

The film has strong anti-corrosion ability and impact resistance, excellent adhesion, high mechanical strength, salt spray resistance, oil resistance, chemical resistance and good compatibility.

III. Product Applications:

The paint is mainly used for the steel structure, chemical plant, anti-rust and anti-corrosion of steel surface. The zinc yellow epoxy primer can also be used for the aluminum alloy, galvanized parts and light metal surface to protect the light metal from corrosion.

IV. Product Varieties:

Epoxy sealant primer, epoxy zinc yellow, gray, iron red primer

V. Technical Specifications:

 

project

qualification

Color and appearance of the film coating

The paint film meets the standard sample and falls within the acceptable color difference range, with a smooth finish.

fineness ,μm

60

Viscosity (tested on Cup 4# at 23±2), s

60

Impact strength, kg·cm

50

Hardness (double pendulum)

0.4

flexibility mm

1

Adhesion (circle method), grade

1

Drying time (25)

The drying time of the surface is h

2

Practical work hours: h

24

Drying at 120°C for 1 hour

0.5

Saltwater resistance (immersed in 3% salt water at 25for 48 hours for iron red and gray, and 96 hours for zinc yellow)

No foaming, no peeling, no rusting

Nitro-resistant (after drying and wet grinding, bake at 60°C for half an hour, spray with white nitro-based external magnetic paint for about 18 seconds)

Non-swelling, wrinkle-resistant, and color-resistant

Polishing

Easy to polish, does not stick to sandpaper

VI. Supporting Paints:

Acrylic Polyurethane Topcoat, Acrylic Paint, chlorinated rubber paint, epoxy paint, Alkyd Paint, etc.

7. Construction steps:

Step 1: Substrate preparation

The steel surface shall be cleaned of oil, dust, and loose oxide scale, and then shot peening or sandblasting shall be applied to meet the Swedish rust removal standard Sa2.5.

Note: Sa2.5 standard: Thorough abrasive spraying to completely remove rust and oxide scale. After dust removal, the steel surface should exhibit a near-white metallic luster with only minor marks. Step 2: Painting process

1. Before painting, mix the paint slurry thoroughly. Then, according to the required amount for application, combine the paint slurry with the curing agent in the specified ratio. After 20 minutes of curing, proceed with the application.

2. The prepared paint must be used within 6 hours at 25°C.

3. Mixing ratio: epoxy primer: epoxy curing agent: epoxy thinner =100:15:30 (by weight).

4. The coating interval is 24 hours at 25.

5. It is recommended to apply two spray layers using the wet-on-wet technique, with a 10-15 minute interval between each layer.

8. Construction Environment:

1. When the construction temperature drops below 10, the curing reaction slows down and drying time is prolonged. Therefore, the temperature should preferably be maintained above 15.

2. The substrate temperature should be at least 3higher than the dew point temperature before painting.

9. Painting method:

spray method

airless spraying

air spraying

roll coating/brush coating

thinner

Special diluent for epoxy resin

Special diluent for epoxy resin

Special diluent for epoxy resin

dilution

0-10%

10-20%

10-15%

air pressure

14-15Mpa

0.3-0.6Mpa

----

 

10. Precautions:

1. The Star Original Epoxy Paint must be diluted with its exclusive diluent.

2. Before applying the next coat of primer, ensure the epoxy primer film is fully cured to maintain interlayer adhesion (complete curing typically takes 7 days). In dry conditions, mist the area around the floor to maintain relative humidity between 40-70%.

Note: To confirm complete curing, press the zinc-rich primer surface with the edge of a coin and slide it. If a metallic sheen appears, the coating is fully cured.

3. The paint film is not resistant to outdoor sunlight and prone to powdering; apply a matching topcoat promptly.

4. Construction is not recommended in conditions of rain, fog, wind, direct sunlight, or humidity exceeding 85%.

11. Storage, Transportation, and Shelf Life:

1. The product should be stored in a well-ventilated and dry place, and should be protected from direct sunlight. In summer, appropriate cooling measures should be taken when the temperature is too high.

2. During transportation, protect the product from rain and direct sunlight.

3. The product has a shelf life of 12 months. During storage, the packaging must remain unopened and meet the storage conditions. After the expiration date, the product may be inspected according to the specified items in the product standards. If the results meet the quality requirements, the product can still be used.

12. Safety and Environmental Protection Statement:

1. This product is flammable. Ensure proper ventilation and take necessary protective measures during application.

2. If the skin is stained with paint, wash it immediately with soap or other cleaning agents and plenty of water.

3. The disposal of waste paint and packaging materials must comply with local environmental regulations.

 


ONLINE MESSAGE

Please fill in a valid email address
Captcha Can not be empty

RELATED PRODUCTS

No search results found!

Company Address:

Guojiatun Industrial Park, Xiangzhou Town, Zhucheng City, Weifang, Shandong Province, China.

Market Cooperation:

Manager Xuan:+86 18563627592



Copyright © 2025 Weifang Xingyuan Paint Industry Co., Ltd

Sitemap

This website uses cookies to ensure you get the best experience on our website.

Accept Reject